Latin Muslim Brides

this process is embodied in to the tasks implemented by the organization since our first separate actions

Декабрь 28, 2019

The Lazarevsky Bridge throughout the Small Nevka River sticks out for the distinctive and expressive design developed in 2000 – 2009 (with a few breaks) for the bridge reconstruction. In reality, the old numerous period beam bridge happens to be reconstructed into a contemporary cable-stayed connection with powerful and also at the same time really exquisite outlines. As a result of that the renovated Lazarevsky Bridge is over and over utilized as a model whenever shooting films.

Construction of the bridge that is new the Ob River in Novosibirsk (positioned during the positioning of Olovozavodskaya Street) is one of remarkable present project regarding the business. The connection comprises an arch river span (a tied up arch with likely suspenders, so named “network arch”) 380 m long, which can be accurate documentation value both for Russia as well as for European countries. Aesthetically, the 70-m arch that is high a gigantic red bow that is among the Siberian symbols represented into the coating of arms of Novosibirsk.

Participation when you look at the task for reconstruction associated with the M-4 Don Federal path is a milestone that is important the company’s life.

Comparison analysis of Russian and German road design codes had been carried down in 2010-2011 when making the street cost area from KM933 to KM1024. The task happens to be implemented in cooperation with a company that is german at the effort and help associated with the customer, Russian Ministry of Transport and State Company AVTODOR. The style happens to be developed simultaneously based on the Russian and German requirements. And also this permitted choosing the most optimal design solutions for the task. (далее…)